First-piece approval
The first article is measured against the drawing and approved before any batch runs — by us, and by you if you wish.
We would rather show you a register than make a claim. Our quality system is documented, measured and open to your auditors.
An audit visit: NDA first if you need one, then a plant walk-through with the management team — registers, first-piece records and calibration records are shown on the day. Send the request and we propose dates.
Green Channel supplier status, a documented QMS, traceability, confidentiality and the registrations behind the plant — each one shown at the audit, not just claimed.
Our components are accepted at customer plants without incoming inspection — a status certified by pharma and packaging OEM customers after their audits, and kept through every delivery.
Controlled shop-floor records from material receipt to dispatch · first-piece approval before every batch · calibrated measuring instruments · rejection root-cause reports with corrective action · supervisor SOP audits on the shop floor.
Material traceability per lot, inspection records with every dispatch, material test certificates and certificates of conformity on request.
Drawings and CAD data are used only for your job. NDA on request. Our marketing names no customers and shows no customer parts without written permission.
Licensed factory · Udyam-registered MSME · GST-registered. ISO 9001:2015 certification is on our 2027 roadmap; the management board reviews quality objectives in a formal management review.
Our customers include manufacturers whose own customers audit them. Every part of how we work — tooling, records, measurement, documentation — is built to stand in that chain.
Green Channel supplier status means our components enter customer plants without an incoming QC hold — certified by pharma and packaging OEM customers after their audits, and kept through consistent, inspected deliveries.
Our own pattern and tooling shop controls development timelines, trials and iterations — and keeps your programme confidential under one roof.
First-piece approval before every batch, calibrated measuring instruments, controlled shop-floor records and material traceability on every lot.
Prototype, tooling, forming, machining, finishing, inspection and dispatch by the same team — one purchase order, one quality system, one point of responsibility.
Tolerances agreed per drawing at the DFM stage — formed profiles typically ±1.0 mm, machined features to drawing. Every lot leaves with its records; sample documents are shown at the audit visit.
The first article is measured against the drawing and approved before any batch runs — by us, and by you if you wish.
In-process checks on calibrated instruments and controlled shop-floor records; inspection records travel with every lot.
Material traceability per lot; material test certificates and certificates of conformity on request.
Drawings and CAD data are used only for your job. NDA on request; customer audits welcome at the Vadodara plant — request dates.
Every registration an auditor asks for, with its number — and the ISO 9001:2015 certification on our 2027 roadmap, reviewed by the management board.
Factory Licence 59934 · Plot A-48, Manjusar–Savli GIDC, Vadodara, Gujarat – 391775, India.
M/s Kalpavrux · Partnership firm, Regn. No. GUJ/VDD/7650 · GSTIN 24AABFK8889J1ZR · Udyam UDYAM-GJ-24-0004280.
Management review of quality objectives by the five-member board; certification programme owned by Operations.